Sunday, September 20, 2015

Samsung Vessel & Drum Piping Design Standard

Samsung Vessel & Drum Piping Design Standard

Table of Contents

Page
1. General
1.1 Purpose
1.2 Scope
1.3 Reference
1.4 Terms and Definition

2. DRUM & VESSEL Summary
2.1 DRUM Type
2.2 DRUM & VESSEL Type
2.3 DRUM & VESSEL Arrangement
2.4 DRUM & VESSEL Installation
2.5 NOZZLE ORIENTATION & PLATFORM Arrangement
2.6 VESSEL Piping Design Standard

3. REACTOR
3.1 REACTOR Arrangement
3.2 REACTOR NOZZLE ORIENTATION & PLATFORM
3.3 REACTOR Piping Design Standard

4. VESSEL ORIENTATION
4.1 Orientation
4.2 PIPE SUPPORTS AND GUIDES
4.3 SKIRTS AND ACCESS OPENINGS
4.4 NAMEPLATES
4.5 LADDERS AND PLATFORMS
4.6 PLATFORM PENETRATING SLEEVES
4.7 DAVITS

5. VERTICAL VESSEL ORIENTATION
5.1 VERTICAL ORIENTATION REQUIREMENTS
5.2 ORIENTATION INFORMATION DRAWING Drafting
5.3 VERTICAL VESSEL ORIENTATION
5.4 PIPE SUPPORT AND GUIDE

6. HORIZONTAL VESSEL ORIENTATION
6.1 ORIENTATION REQUIREMENTS
6.2 ORIENTATION INFORMATION DRAWING
6.3 HORIZONTAL VESSEL ORIENTATION Standard
6.4 LADDER & PLATFORM

7. VERTICAL VESSEL ORIENTATION Design Standard
7.1 General
7.2 LADDER AND PLATFORMS
7.3 MANHOLES
7.4 PROCESS NOZZLES
7.5 MISCELLANEOUS NOZZLES
7.6 PIPE SUPPORTS AND GUIDES
7.7 VESSEL DAVITS
7.8 MISCELLANEOUS ITEMS

8. HORIZONTAL VESSEL Design Standard
8.1 General
8.2 LADDERS AND PLATFORMS
8.3 MANHOLES
8.4 NOZZLES
8.5 MISCELLANEOUS ITEMS

9. Revision History

Appendix

Ⅰ : Vessel Orientation - Elevation
Ⅱ : Platform with Manhole In Traffic Pattern
Ⅲ : Step Off Platform
Ⅳ : First or Grade Plan Platform
Ⅴ : Platform with Manhole in Traffic Pattern
Ⅵ : Top Head Platform
Ⅶ : Horizontal Vessel Layout - General Arrangement
(Elevation within Structure)
Ⅷ : Horizontal Vessel Layout - General Arrangement (Plan)
Ⅸ : Horizontal Vessel Layout - General Arrangement (End Typical Elevation)
Ⅹ : Horizontal Vessel Layout - General Arrangement (Elevation at Grade)
ⅩⅠ : Access Requirements for Vessels
ⅩⅡ : Minimum Ladder Clearances
ⅩⅢ : Layout - Minimum Platform Width Requirements for Manholes
ⅩⅣ : Platform Layout Guide
ⅩⅤ : Platform - Nozzle Clearances and Projections
ⅩⅥ : Platform Opening - Banding
ⅩⅦ : Davits
ⅩⅧ : Skirt Height and Opening
ⅩⅨ : Simplified Method of Drawing 2:1 Semi - Elliptical Head

Purpose
This Manual is to enhance efficiency and systemize Drum, Vessel, and Piping Design around general Reactor in Plan to be designed by SECL.






Please note, we do not host any material and these are being shared from links found online. If anyone has objection with this, kindly email at ankit@pipingguide.net. Proper action shall be taken within 48 hours. 

Get Notified for new Tutorials:
*Check your email to confirm your subscription*


0 comments :

Post a Comment

 

© 2011 PIPING GUIDE - Designed by Ankit | ToS | Privacy Policy | Sitemap

About Us | Contact Us | Write For Us