ASME B31.3 Process Piping - Layout and Support

General Considerations
  • Access for operation (valves)
  • Access for maintenance of in-line devices
  • instrumentation
  • Traps
  • strainers, etc.
  • Avoiding interference with other activities
  • Removing heat exchanger bundles
  • Clearance for pump maintenance, etc.
  • Appearance
  • Drainage (slope) requirements
  • Pressure drop
  • Cost of piping, including maximizing use of existing supports
  • Avoiding interference with other piping
  • Clearance for application of insulation
  • Clearance for piping displacement, etc.
  • Provisions for future additions

Support Spacing

Two principal sources:

1. Recognized codes & standards
  • ASME B31.1
  • MSS SP-69: Pipe Hangers and Supports – Selection and Application
2. Owner or designer calculated values

Usually based on simplifying assumptions

  • Combination of pipe material and wall thickness used in the facility that gives the shortest spans
  • Contents specific gravity, usually 1.0
  • Typical insulation thickness and density
  • Person walking on pipe for larger sizes